-

检索结果分析

署名顺序

ESI高水平论文

结果分析中...

成果/Result

已选条件:
  • 收录类型=SSCI x
  • 机构=应用数学研究所 x

3 条 记 录,以下是 1-3

视图:
排序方式:
共1页<< <1> >>每页显示条目数:
Minimizing the number of late jobs under the group technology assumption被引量:28收藏 分享
作者:Liu, ZH Yu, WC
机构:E China Univ Sci & Technol
来源:JOURNAL OF COMBINATORIAL OPTIMIZATION  1999
关键词:one-machine scheduling   group technology   number of late jobs   NP-hardness   polynomial algorithm  
ON DECOMPOSITION OF THE TOTAL TARDINESS PROBLEM被引量:25收藏 分享
作者:Chang, S. Lu, Q. Tang, G. Yu, W.
机构:E CHINA UNIV SCI & TECHNOL;WUHAN UNIV;SHANGHAI SECOND POLYTECH UNIV
来源:OPERATIONS RESEARCH LETTERS  1995
关键词:SCHEDULING THEORY   ONE-MACHINE TOTAL TARDINESS PROBLEM   DECOMPOSITION THEOREM   BACKWARD SHIFT  
Scheduling groups of unit length jobs on two identical parallel machines被引量:8收藏 分享
作者:Liu, Zhaohui Yu, Wenci Cheng, T.C. Edwin
机构:Hong Kong Polytech Univ;E China Univ Sci & Technol
来源:INFORMATION PROCESSING LETTERS  1999
关键词:group technology   scheduling   algorithms  
已选条目 检索报告 聚类工具

版权所有©华东理工大学 重庆维普资讯有限公司 渝B2-20050021-7 
渝公网安备 50019002500408号 违法和不良信息举报中心