详细信息
Approximation Algorithms for Multi-vehicle Stacker Crane Problems
文献类型:期刊文献
中文题名:Approximation Algorithms for Multi-vehicle Stacker Crane Problems
作者:Wei Yu[1];Rui-Yong Dai[1];Zhao-Hui Liu[1]
机构:[1]Department of Mathematics,East China University of Science and Technology,Shanghai,200237,China
年份:2023
卷号:11
期号:1
起止页码:109
中文期刊名:Journal of the Operations Research Society of China
外文期刊名:中国运筹学会会刊(英文)
收录:Scopus;CSCD:【CSCD2023_2024】;
基金:This research was supported by the National Natural Science Foundation of China(Nos.11671135 and 11871213);the Natural Science Foundation of Shanghai(No.19ZR1411800)。
语种:英文
中文关键词:Approximation algorithm;Vehicle routing problem;Stacker Crane Problem;Pickup and delivery problem
摘要:We study a variety of multi-vehicle generalizations of the Stacker Crane Problem(SCP).The input consists of a mixed graph G=(V,E,A)with vertex set V,edge set E and arc set A,and a nonnegative integer cost function c on E∪A.We consider the following three problems:(1)k-depot SCP(k-DSCP).There is a depot set D?V containing k distinct depots.The goal is to determine a collection of k closed walks including all the arcs of A such that the total cost of the closed walks is minimized,where each closed walk corresponds to the route of one vehicle and has to start from a distinct depot and return to it.(2)k-SCP.There are no given depots,and each vehicle may start from any vertex and then go back to it.The objective is to find a collection of k closed walks including all the arcs of A such that the total cost of the closed walks is minimized.(3)k-depot Stacker Crane Path Problem(k-DSCPP).There is a depot set D?V containing k distinct depots.The aim is to find k(open)walks including all the arcs of A such that the total cost of the walks is minimized,where each(open)walk has to start from a distinct depot but may end at any vertex.We present the first constant-factor approximation algorithms for all the above three problems.To be specific,we give 3-approximation algorithms for the k-DSCP,the k-SCP and the k-DSCPP.If the costs of the arcs are symmetric,i.e.,for every arc there is a parallel edge of no greater cost,we develop better algorithms with approximation ratios max{9/5,2?1/2k+1},2,2,respectively.All the proposed algorithms have a time complexity of O(|V|3)except that the two 2-approximation algorithms run in O(|V|2log|V|)time.
参考文献:
正在载入数据...
