详细信息
Research on zero-wait scheduling problems in multiproduct processes with due dates ( EI收录)
文献类型:期刊文献
英文题名:Research on zero-wait scheduling problems in multiproduct processes with due dates
作者:Xu, Zhenhao[1]; Gu, Xingsheng[1]
机构:[1] Key Laboratory of Advanced Control and Optimization for Chemical Processes, Ministry of Education, East China University of Science and Technology, Shanghai 200237, China
年份:2013
卷号:355
起止页码:322
外文期刊名:Communications in Computer and Information Science
收录:EI(收录号:20133816757955)
语种:英文
外文关键词:Computation theory - Scheduling algorithms - Batch data processing - Production control
摘要:Production scheduling is an important aspect of batch process operations to achieve high productivity and operability. In this paper, we considered a zero-wait multiproduct scheduling with due dates under uncertainty, where the total weighted earliness/tardiness penalty is to be minimized. The imprecise processing time is expressed with the triangle fuzzy variable and the model has been established based on fuzzy cut-set theory. A new improved shuffled frog-leaping algorithm (ISFLA) is introduced to search optimal objective for the given problem, which has a new updating rule in memeplexes. In order to enhance the ability to search the global optimum, the strategy of Forced Moving of the worst frog in each sub-memeplex is proposed to increase the diversity. Simulated results demonstrate that ISFLA has outperformed the conventional SFLA, which is effective and robust in solving the zero-wait scheduling with due-date window. ? Springer-Verlag Berlin Heidelberg 2013.
参考文献:
正在载入数据...
