详细信息

Research on zero-wait scheduling problems in multiproduct processes with due dates  ( EI收录)  

文献类型:期刊文献

英文题名:Research on zero-wait scheduling problems in multiproduct processes with due dates

作者:Xu, Zhenhao[1]; Gu, Xingsheng[1]

机构:[1] Key Laboratory of Advanced Control and Optimization for Chemical Processes, Ministry of Education, East China University of Science and Technology, Shanghai 200237, China

年份:2013

卷号:355

起止页码:322

外文期刊名:Communications in Computer and Information Science

收录:EI(收录号:20133816757955)

语种:英文

外文关键词:Computation theory - Scheduling algorithms - Batch data processing - Production control

摘要:Production scheduling is an important aspect of batch process operations to achieve high productivity and operability. In this paper, we considered a zero-wait multiproduct scheduling with due dates under uncertainty, where the total weighted earliness/tardiness penalty is to be minimized. The imprecise processing time is expressed with the triangle fuzzy variable and the model has been established based on fuzzy cut-set theory. A new improved shuffled frog-leaping algorithm (ISFLA) is introduced to search optimal objective for the given problem, which has a new updating rule in memeplexes. In order to enhance the ability to search the global optimum, the strategy of Forced Moving of the worst frog in each sub-memeplex is proposed to increase the diversity. Simulated results demonstrate that ISFLA has outperformed the conventional SFLA, which is effective and robust in solving the zero-wait scheduling with due-date window. ? Springer-Verlag Berlin Heidelberg 2013.

参考文献:

正在载入数据...

版权所有©华东理工大学 重庆维普资讯有限公司 渝B2-20050021-7 
渝公网安备 50019002500408号 违法和不良信息举报中心