详细信息
BOT项目特许权期决策模型在老挝某水电站中的应用研究
Study on Application of Concession Period Decision Models of BOT Project in a Hydropower BOT Project in Laos
文献类型:期刊文献
中文题名:BOT项目特许权期决策模型在老挝某水电站中的应用研究
英文题名:Study on Application of Concession Period Decision Models of BOT Project in a Hydropower BOT Project in Laos
作者:何时有[1];王宜博[2];黄庐进[3]
机构:[1]中国电建集团海外投资有限公司,北京100048;[2]九元航空有限公司,广东广州510470;[3]华东理工大学商学院,上海200237
年份:2015
卷号:41
期号:8
起止页码:102
中文期刊名:水力发电
外文期刊名:Water Power
收录:CSTPCD;;Scopus;北大核心:【北大核心2014】;
语种:中文
中文关键词:BOT项目;特许权期;决策模型;水电站
外文关键词:BOT project; concession period; decision model; hydropower station
摘要:通过分析现有特许权期决策方法,以老挝某水电站BOT项目特许权期的决策过程为例进行理论分析,优化了特许权期决策模型,希望为BOT项目中政府和企业的决策提供理论参考的依据。
By analyzing current decision models for concession period, and taking a hydropower BOT project in Laos as example to carry out theoretical analysis on the decision process of concession period, the decision model of concession period is optimized. It is expected that the study can provide some insights for the decision-making by governments and enterprises in BOT projects.
参考文献:
正在载入数据...
