详细信息

Cost allocation evaluation of a multi-plant flexible heat exchanger network design based on fuzzy game  ( SCI-EXPANDED收录 EI收录)  

文献类型:期刊文献

英文题名:Cost allocation evaluation of a multi-plant flexible heat exchanger network design based on fuzzy game

作者:Tian, Yitong[1];Li, Shaojun[1]

机构:[1]East China Univ Sci & Technol, Key Lab Smart Mfg Energy Chem Proc, Minist Educ, Shanghai 200237, Peoples R China

年份:2023

卷号:175

外文期刊名:COMPUTERS & CHEMICAL ENGINEERING

收录:;EI(收录号:20231713951719);WOS:【SCI-EXPANDED(收录号:WOS:001007164400001)】;

基金:Acknowledgments The authors of this paper thank the National Natural Science Foun-dation of China (under Project No. 21406064) and the Fundamental Research Funds for the Central Universities under Grant 222201717006 for their financial support.

语种:英文

外文关键词:Flexible heat exchanger network; Fuzzy game; Interval Shapley value; Cost allocation evaluation

摘要:A multi-plant heat exchanger network (HEN) can recover waste heat across plant boundaries and reduce utility consumption in industrial parks. Conventional multi-plant heat integration using nominal conditions cannot handle uncertainties from the environment or plant operations that affect stream properties; therefore, a flexible HEN design is more practical. This study is focused on the evaluation of an already designed flexible HEN with a fixed network structure and the provided heat exchanger areas to maintain operability under disturbances. Although the capital cost is determined, utility consumption is uncertain to meet possible target temperatures. Consequently, the total annual cost (TAC) varies and forms a distribution that can give plant operators more information about possible costs as well as extreme parameter values. To provide the TAC distribution, a mathematical model is established to calculate utility costs after inputting different stream parameters into the designed HEN configuration. In addition, an interval Shapley value from the fuzzy game, which considers the contribution of each plant when the decision environment is uncertain, is used to generate a cost allocation interval. For example, the potential costs paid for Plant 1 and Plant 2 in Case study 1 ranged from $18,195.95 to $25,897.80 and $14,778.05 to $19,921.20, respectively. These results demonstrate that the proposed approach can be used to evaluate a provided flexible HEN design before construction.

参考文献:

正在载入数据...

版权所有©华东理工大学 重庆维普资讯有限公司 渝B2-20050021-7 
渝公网安备 50019002500408号 违法和不良信息举报中心