详细信息

A capacity-investment model of wind power with uncertain supply-price under high penetration rate  ( SCI-EXPANDED收录 EI收录)  

文献类型:期刊文献

英文题名:A capacity-investment model of wind power with uncertain supply-price under high penetration rate

作者:Kong, Lingcheng[1];Li, Zhong[2];Liang, Ling[3];Xia, Yu[4];Xie, Jiaping[4]

机构:[1]East China Univ Sci & Technol, Business Sch, Shanghai 200237, Peoples R China;[2]Shanghai Univ Engn Sci, Sch Management, Shanghai 201620, Peoples R China;[3]Shanghai Univ Int Business & Econ, Tourism & Event Management Sch, Shanghai 201620, Peoples R China;[4]Shanghai Univ Finance & Econ, Sch Int Business Adm, Shanghai 200433, Peoples R China

年份:2018

卷号:178

起止页码:917

外文期刊名:JOURNAL OF CLEANER PRODUCTION

收录:;EI(收录号:20180704796515);WOS:【SSCI(收录号:WOS:000425558600080),SCI-EXPANDED(收录号:WOS:000425558600080)】;

基金:The work was supported by National Social Science Found of China (Grant No. 15ZDB161) and National Natural Science Foundation of China (Grant No. 71273091).

语种:英文

外文关键词:Wind power; Intermittent energy; Capacity planning; High penetration rate

摘要:With the rapid development of renewable energy, the proportion of wind power in power supply has grown significantly. Also, it influences the power price fluctuation. Since the marginal cost of wind power is almost zero, the growth of wind power's penetration rate has led to a crowding-out effect and challenged traditional power generation technology, substantially reducing the power price in the market. In perfect competition market, the real-time balance between supply and demand of power is regulated by the real-time power price fluctuation. So this paper models the intermittence of wind power as uncertain supply, and develops a capacity-investment model under the uncertainties of both supply and demand. We introduce priority dispatch elasticity to describe the crowding-out effect and take the power price to be endogenous in order to model the situation of high penetration rate. We compare the optimal wind power capacity decision under the strategy of priority grid connection and abandoned power management. Our results show that optimal capacity investment is inversely related to priority dispatch elasticity under both strategies. However, the profit from power generation is always higher when adopting the abandoned power management strategy. (C) 2018 Elsevier Ltd. All rights reserved.

参考文献:

正在载入数据...

版权所有©华东理工大学 重庆维普资讯有限公司 渝B2-20050021-7 
渝公网安备 50019002500408号 违法和不良信息举报中心